
If you run a US operation, your questions are practical. Where do AMRs create value? How do they share space with people and forklifts? What integration work is hidden underneath? And will a result from Denmark or Ohio hold up at your site?
Key Takeaways
- Strong deployments start with a defined material-flow problem, not a robot purchase.
- Results depend on the whole system: fleet software, layout, interfaces, charging, and workers.
- Credible cases report trade-offs and limits, not only gains.
- Compare baselines, check who reported each number, and prove assumptions in a pilot.
How to Read an Autonomous Mobile Robot Case Study
An AMR uses onboard sensors, mapping, and navigation software to move through a facility without a fixed guide path. According to A3's glossary, it can replan around obstacles. An AGV follows preset paths and suits predictable, repetitive point-to-point work.
What to Look For
A useful case study records:
- The original process and its baseline
- Load type, weight, and travel distance
- Traffic conditions and shared aisles
- Robot and attachment configuration
- Software integrations (WMS, MES, ERP)
- Staffing model and deployment timeline
Which Metrics Matter
Look for before-and-after numbers on:
- Travel time and throughput
- Labor hours redeployed
- Accuracy and utilization
- Incidents and uptime
- Energy use and payback
The 2024 MHI survey found reliability and uptime were "very important" to 92% of respondents, and 82% rated TCO, ROI, and maintenance costs important, as Modern Materials Handling reported.
How to Judge the Evidence
Separate the tiers:
- Independently measured results
- Supplier- or customer-reported figures
- Employee testimonials
- Forecasts and projected benefits
- Results from small or simulated studies
Most published AMR cases sit in the second tier. That's not disqualifying, but ask for the measurement period, work mix, and calculation method. Also remember that automation can amplify existing process inefficiencies.
Case Study: AMRs for Warehouse Pallet Transport and Fleet Coordination
The Problem and Deployment
ICM, a warehouse in Odense, Denmark, runs from 7:00 a.m. to 10:00 p.m. and handles 31,000 pallets and 100,000 orders a year, per the RARUK Automation case. Workers place pallets on special racks. MiR robots carry them to aisle ends, where high-reach truck operators put them away.
MiR's companion case identifies 3 MiR1000 robots. Confirm fleet software, charging method, and route design with the vendor when comparing deployments.
How the Workflow Changed
- Robots took over the repetitive transport leg between staging and aisles.
- Humans kept the put-away decisions and the high-reach truck work.
- Operators see robot locations on a tablet.
- Robots use audible signals and lights in busy areas.
Reported Outcomes and Limits
MiR reports 40 labor hours saved per week, with staff moving to more complex, higher-value tasks. Treat that figure as a vendor claim: the method is undisclosed, and no independent validation or comparable before-and-after productivity metric is available.
The role shift is described only in qualitative terms, so it is not proof that jobs simply disappear or appear.
Transferability depends on site conditions you should verify locally:
- Pallet variability and rack interfaces
- Aisle width and floor quality
- Traffic density and shift patterns
- Charging availability
- Reliable warehouse-system data
Other Pallet Examples
US cases show gains in a related task, case picking. Allen Distribution in Carlisle, Pennsylvania, reported output rising from 135-150 to over 350 picks per hour with Prime Robotics' pallet AMR. That figure is a vendor claim; robot count and costs are not disclosed.
GEODIS in Indianapolis reported a 1.7x productivity gain with Vecna pallet-jack AMRs, per Automated Warehouse, without an absolute baseline.
The Transferable Lesson
This model fits sites with repetitive pallet moves, repeatable pickup and drop-off points, and mixed human-machine traffic. It works best when the facility redesigns workflows around fleet coordination instead of treating AMRs as isolated forklifts.
Case Study: AMRs for Manufacturing Material Flow and Flexible Production
The Bottleneck
At Rockwell Automation's 250,000-square-foot plant in Twinsburg, Ohio, about 52% of daily material-movement trips were manual, and operators walked more than 8 hours a day.
Deployment
The rollout ran in two stages:
- Phase 1: 3 OTTO 100 AMRs and 40 carts across four assembly lines, dispatched manually
- Phase 2: FactoryTalk Orchestration and MES connected to OTTO Fleet Manager so production orders triggered movement

Results and Evidence Limits
Rockwell's case study reports:
- $162,000 in annual Phase 1 savings
- WIP staging space cut 50%
- Space utilization up 70%
- Production-line downtime down 20%
- ROI within 1.5 years

This is the company's own account, not independent validation. Implementation cost and project duration aren't stated. The phased rollout is the instructive part: manual dispatch first, system integration second, then a template extended to three other facilities.
Other Manufacturing Examples
- Polar Semiconductor deployed 7 OMRON AMRs and automated over 40 miles of internal movement per product lifecycle, without published labor or throughput baselines.
- Cabka North America uses a MiR500 to move finished pallets, an estimated 3 miles a day on one line, with plans for 11 lines. That's a travel estimate, not a productivity result.
AMR, AGV, or Conveyor?
Match the technology to how fixed your flow is:
- Conveyors: fast, predictable fixed-point flow, but harder to reconfigure
- AGVs: repeatable, heavier moves on defined routes
- AMRs: dynamic spaces, changing routes, and staged scaling, per Cisco-Eagle's comparison
The Lesson for Manufacturers
AMRs fit best when you need:
- Frequent layout changes
- Multiple destinations and variable routes
- Repetitive transport without permanent infrastructure
Case Study: Human-Robot Collaboration, Safety, and Worker Trust
The Human-Factors Question
Navigation alone doesn't tell you whether workers understand, trust, and safely respond to a robot. NIOSH researchers Justin Haney, Marvin Cheng, and Emily Haas tested an auditory alert in a 2025 RoboticsTomorrow case study (an online article, not a journal paper).
Study Design
- Nine adults (mean age 22) in a NIOSH Morgantown lab simulation
- A Zebra Freight100 AMR, with participants moving boxes between carts 5.5 m apart
- Conditions varied AMR height, parallel or perpendicular movement, and alert on or off
- The alert was three 1000-Hz pulses
Measures covered perceived surprise and fear, NASA-TLX workload, trust (including predictability and dependability), task time, walking speed, and path deviation.
What It Found
- Trust rose from 75.31 to 84.10 with the alert (p<.001), with better predictability and dependability.
- Fear was higher with moving robots than at baseline, and alerts tended to raise it slightly.
- Temporal demand and frustration rose with the alert versus baseline.
- Task time didn't change significantly. Average walking speed dipped slightly (873 vs. 905 mm/s).

So the alert made the robot's intent clearer but didn't make the interaction feel calmer.
Turning Findings Into Decisions
How people respond depends on more than the robot itself:
- Sound and visual indicators
- Projected paths and speed limits
- Zoning, traffic rules, and line of sight
- Training
An experiment still isn't a floor recommendation. Complete a site-specific risk assessment using OSHA's robotics hazard guidance alongside applicable standards.
Limitations
The sample was small, young, and tested in a lab with no real workplace noise. A busy US facility has forklifts, background noise, and experienced workers. Track acceptance on site through:
- Worker feedback and near-miss reports
- Intervention frequency
- Training completion
- Compliance with traffic procedures
What These Autonomous Mobile Robot Case Studies Mean for US Deployment
Select the Right Pilot
Pick a repetitive, measurable transport task with stable pickup and drop-off points, clear load specs, enough volume, and a baseline you can capture first. Document before you buy:
- Floor conditions and aisle widths
- Pedestrian and forklift traffic
- Wireless coverage and safety zones
- Charging locations
- Exception handling when a robot can't finish a mission
Plan for a slow start. Integrator guidance commonly cited in the industry is to begin with one or two robots, and process evaluation can take months.
Plan Integration and Scale-Up
Define interfaces with WMS, MES, ERP, conveyors, doors, elevators, and fleet software before finalizing the robot. Then check current US requirements:
- ANSI/A3 R15.08 parts 1-3 for industrial mobile robots
- ANSI/ITSDF B56.5-2024, after checking its scope for your AMR
- OSHA 29 CFR 1910.178, where the vehicle falls under powered industrial trucks
- NIST SP 800-82 Rev. 3 and IEC 62443 for operational-technology security
None of these is a blanket AMR rule, so confirm applicability.
A Provider Option
IPLUSMOBOT offers AMRs, fleet software, and intralogistics solutions, from standalone robots to plant-wide deployments. Its CLOUDIA fleet software integrates with WMS, MES, and ERP systems. In a battery-factory deployment, AMRs moved racks through roller shutters and air showers while CLOUDIA updated MES status in real time.
Its published cases are mostly outside the US. Before requesting a solution assessment, integrators and manufacturers should confirm:
- Robot type and payload fit
- Software capabilities and integration responsibilities
- Support model
- US customer references and deployment results
Define the Business Case
Build ROI from these inputs:
- Equipment and integration costs
- Labor hours redeployed
- Throughput or capacity gains
- Avoided infrastructure
- Maintenance, training, charging, and downtime
- Safety improvements and expected useful life
MHI's guidance says operations commonly target a 12-24 month payback for warehouse automation. Rockwell's 1.5-year payback is one company's result, not a benchmark. Compare several documented cases, run a feasibility study, and validate assumptions in a pilot.
Frequently Asked Questions
What is an autonomous mobile robot (AMR)?
An AMR senses and navigates changing environments to complete tasks. Typical uses include material transport, pallet handling, picking support, and line-side delivery.
How is an AMR different from an AGV?
AMRs navigate autonomously and replan routes. AGVs typically follow fixed or predefined paths. The better choice depends on your facility and task.
What industries use autonomous mobile robots?
Manufacturing (automotive, EV components, electronics, PCBA, new energy), warehouses, and 3PL distribution use them. Any site with repetitive material movement is a candidate.
What metrics should an AMR case study include?
Baseline and post-deployment throughput, travel time, labor allocation, accuracy, uptime, safety indicators, utilization, integration performance, and ROI.
Are AMRs safe to use around workers?
Safety depends on the robot's sensing and controls, facility design, traffic rules, risk assessment, training, maintenance, and compliance with applicable US requirements.
How do companies calculate the ROI of an AMR deployment?
Total ownership and integration costs are weighed against gains in labor allocation, capacity, productivity, safety, quality, and avoided fixed infrastructure.